2017 0418 50Fifty Update
On
In
Construction Update
Grade beams construction continues including formwork, reinforcing, concrete pour, formwork stripped, backfill and drainage mat applied to the outside face. Some of our connector walls have also been cast, propped up with temporary bracing, and covered with waterproofing.