2017 0207 50Fifty Construction Update

On In Construction Update

Excavation of 50Fifty is just about complete, and we’ve started drilling piers for the foundation. Rebar cages are being fabricated at the south end of the site, and temporary power is in place at the bottom of the excavation pit.

2016 1121 50Fifty Groundbreaking

On In Construction Update

Several years of grinding to get to this point, thanks to all these people. Today we celebrate, tomorrow we get back to work. Building core and shell completion to occur in the 3rd quarter of 2018. Going to be a good one!

2016 1026 5050 Demolition

On In Construction Update

It’s an exciting time at the 5050 S Syracuse job site. Hensel Phelps has mobilized, and the existing building is coming down. We expect to have an official ground breaking ceremony some time next month.

2016 0908 50 Fifty Tower – CA Phase – HP Gearing Up

2016 0908 50 Fifty Tower – CA Phase – HP Gearing Up

On In Construction Update

The Hensel Phelps machine is gearing up for construction activity. As we near the conclusion of Construction Documents and startup of Construction Administration it’s worth remembering how peaceful our lives are at this moment. Zero RFIs! We’re looking forward to the construction process with great anticipation. The opportunity to work with Hensel Phelps on a project of this magnitude is a welcome challenge. It’s going to be a great one!

2016 0624 Stuart St Construction

On In Construction Update

The residence on Stuart street is well underway. Still one more floor to go before it’s topped out. A variety of terraces from the third floor to the walk out basement provide plenty of connections to the outside. An open stair brings light down thru the structure to every level.